top of page

SCOTUS Should Take the Centripetal Networks v. Cisco Appeal

2 days ago
4 min read

Four years since petitioning the U.S. Supreme Court, which denied certiorari in Centripetal Networks Inc. v. Cisco Systems Inc., Centripetal is again appealing its case. The high court has the opportunity to rectify a string of judicial missed calls, thereby restoring fairness and due process not only for Centripetal, but for any patent owner facing a behemoth company suspected of infringing its patents.


The issue here is a district court retrial using a different standard and the Court of Appeals for the Federal Circuit denying fairness and due process, Centripetal contends. The second trial judge proceeded, apart from established Markman process, to modify the construction of relevant patent claims. This is tantamount to moving the property line. Neither the district court nor the Federal Circuit gave Centripetal notice and an opportunity to respond to this change.


Cisco’s response is essentially, “There’s nothing to review here.” And yet, there is. Matters of due process—and getting them right—are of utmost importance. Due process itself is a type of private property right.


More controversial than a football game lost fair and square is a game lost due to an officiating error. A loss because the referees wrongly or inconsistently applied the rules of the game is far more deflating and upsetting because the people charged with applying the rules correctly failed at their job, undeservedly punishing the team. Centripetal has suffered officiating errors in a “game” where the referees changed the rules of the game after the game had been played—making the stakes far more consequential than football.


How Centripetal Got Here

In February 2018, Centripetal sued Cisco, claiming infringement of Centripetal’s patents on a cybersecurity invention. A bench trial began in May 2020. Early on, the judge conducted a Markman process to set the rule for how the patent claims would be construed throughout future proceedings. The standard adopted for claim construction that the parties agreed to was plain-and-ordinary-meaning construction.


Applying this claim construction standard, in October 2020 the court upheld four of five Centripetal patents as valid and infringed. The court deemed Cisco’s conduct “willful and egregious,” awarding Centripetal damages exceeding $3 billion. This ruling may have stood, but for the discovery in August 2020 that the judge’s wife owned 100 shares of Cisco stock worth about $4,700. The judge immediately alerted the parties, assured them the unknown stock holdings had not factored into the ruling he was near completing, and that he had already practically decided all the issues.


Cisco sought the judge’s recusal. In September, the judge announced the Cisco shares were now held in a blind trust and convened a hearing on Cisco’s request. In October, the judge denied the recusal motion, explaining: “‘The Court had devoted months of time into this matter engaging in ruling of pre-trial motions, holding a Markman hearing, conducting an almost six-week bench trial and drafting extensive findings of fact and conclusions of law in a 150-plus page opinion.’”


Next, Cisco sought retrial and filed several motions, all denied in March 2021. Cisco appealed to the Federal Circuit, which in June 2022 overturned the district court’s recusal ruling. The Federal Circuit said selling the stock was the appropriate course, sent the case back for retrial, and vacated the federal district court decision—relieving Cisco of the willful infringement verdict and of the multibillion-dollar damages award.


Centripetal appealed to the Supreme Court the Federal Circuit’s ruling that stock sale, not placement in blind trust, was required, but the high court declined in December 2022 to take the case. Centripetal Networks faced retrying the remanded case. In the Federal Circuit’s order vacating the original verdict, as amicus Alliance of U.S. Startups and Inventors for Jobs notes, the original trial’s ”claim construction order was expressly preserved . . . and should not have been revisited.”


The Rules of This Game

The next district judge held a new trial in 2023. In the retrial, the new judge ignored the first trial’s claim construction. That irregular, unilateral change, made without notice or consent, is out of bounds. Rule 63 of federal civil procedure is intended to preserve as much as possible of the original judge’s work. The moving of the property line of Centripetal’s patents—the use of a substitute claim construction—resulted in the retrial’s finding of no infringement.


Centripetal battled at the Patent Trial and Appeal Board and appealed the second district court verdict to the Federal Circuit, which in April 2026 affirmed the retrial’s opinion for Cisco and against Centripetal. That is, the Federal Circuit went along with the second trial’s deliberate changing of the claim construction rule—which the new judge categorized as simply “elaboration” or “clarification”. That led to the opposite outcome of the original trial’s, whose construction standard led to a finding of willful infringement. In doing so, the appellate court violated its own vacatur order.


The grievous nature of this judicial conduct—not to mention its arguable violation of Rule 63—simply must be reversed. And the only authority that can rectify this wrong is the U.S. Supreme Court. It’s particularly of vital importance to correct the erroneous changing of the original claim construction. The central roles of claim construction are described in amicus U.S. Inventor’s brief:


Claim scope is not just one ordinary issue among many. It organizes the case. Infringement is measured against it. 35 U.S.C. § 271. Invalidity defenses must account for it. Pet. 16. It cabins discovery, determines which experts are needed and what they may say, and sets the boundary of admissible evidence. Pet. 16-17. As one judge observed, “to decide what the claims mean is nearly always to decide the case.” Markman v. Westview Instruments, Inc., 52 F.3d 967, 989 (Fed. Cir. 1995) (en banc) (Mayer, J., concurring), aff’d, 517 U.S. 370 (1996). The parties need to know the construction before they put on their proof, not after.


The cavalier manner in which the retrial judge changed the original trial’s agreed-upon claim construction, the Federal Circuit went along with this erroneous switcheroo, and the drastic adverse effects this rule change has had for Centripetal and will impose on other patent owners’ due process being violated are nothing less than a grievous officiating error. SCOTUS must review this denial of due process and reverse the egregious officiating—reset the rules and undo the officiating error.

 
 
 

Recent Posts

See All
Celebrating National IP Month

October may bring to mind football, the World Series, harvest season, a chill in the air or shortening days. However, we should keep in mind that October is National Intellectual Property Month. Intel

 
 
 
Big Government and America’s Historical Treasures

In July, the Advisory Council on Historic Preservation proposed changes to regulations concerning section 106 of the National Historic Preservation Act. Section 106 relates to protecting historic site

 
 
 
The Filibuster: Principle Over Expedience

In a recent debate of South Carolina candidates in the GOP primary election for U.S. Senate, three of the five contenders present espoused the demise of the Senate’s filibuster rule. Each indicated th

 
 
 

Comments


All rights reserved, © 2017-2026

Conservatives for Property Rights

bottom of page